From installation to production-ready operation, functional testing, configuration and performance validation before handover.

What This Involves
Applies To

SIG Combibloc systems, plus Siemens (TIA Portal, Step 7), Schneider Electric and Beckhoff/Codesys-based controls, including Sinamics, Simodrive and PacDrive drive systems.

Typical Timeline
Pre-Commissioning
1–3 days of checks and preparation
Functional Testing & Configuration
3–7 days, depending on scope
Start-Up & Handover
1–3 days

Indicative only — actual timelines depend on equipment condition, scope and site access.

Platforms & Systems

SIG Combibloc systems (14+ years hands-on)  ·  Siemens (TIA Portal, Step 7)  ·  Schneider Electric  ·  Beckhoff / Codesys  ·  Motor & drive systems — Sinamics, Simodrive, PacDrive  

Planning a new installation before commissioning? See what our installation support covers.

Zunachi Ltd is an independent engineering and consulting firm. We are not affiliated with, endorsed by, or a representative of SIG Combibloc, Tetra Pak, or any other equipment manufacturer named on this site.

Ready to Talk?

Request Commissioning Support