Service 02
Commisioning
From installation to production-ready operation, functional testing, configuration and performance validation before handover.
What This Involves
- Pre-commissioning
- Functional testing
- Machine configuration
- System Checks
- Fault Resolution
- Production start-up
- Performance validation
- Handover support
Applies To
SIG Combibloc systems, plus Siemens (TIA Portal, Step 7), Schneider Electric and Beckhoff/Codesys-based controls, including Sinamics, Simodrive and PacDrive drive systems.
Typical Timeline
Pre-Commissioning
1–3 days of checks and preparation
Functional Testing & Configuration
3–7 days, depending on scope
Start-Up & Handover
1–3 days
Indicative only — actual timelines depend on equipment condition, scope and site access.
Platforms & Systems
SIG Combibloc systems (14+ years hands-on) · Siemens (TIA Portal, Step 7) · Schneider Electric · Beckhoff / Codesys · Motor & drive systems — Sinamics, Simodrive, PacDrive
Planning a new installation before commissioning? See what our installation support covers.
Zunachi Ltd is an independent engineering and consulting firm. We are not affiliated with, endorsed by, or a representative of SIG Combibloc, Tetra Pak, or any other equipment manufacturer named on this site.